PRM
518 – Initiating, Planning, and Executing a Project
Module
5 – Control Account Work Package Calculations Assignment
Review the Control
Account information, and determine the current status for each of the work
packages listed. Using the SeeDAU Gold Cardand/or the
information contained in this module, calculate the SV, CV, SPI, CPI, EAC, VAC
and TCPI for each of the following work packages:
|
Work Package |
EV Technique |
PV or BCWS |
EV or BCWP |
AC or ACWP |
CV |
SV |
SPI |
EAC |
VAC |
TCPI |
|
1.1.1.1.1. Hull |
50/50 |
$310 |
$155 |
$155 |
||||||
|
1.1.1.1.2. Hull |
50/50 |
$9 |
$4.5 |
$1m |
||||||
|
1.2.1. Final Bow Redesign |
% complete |
$4 |
$3.7 |
$4.1 |
||||||
|
1.2.2.1 Systems |
0/100 |
$ |
$1.2 |
$1 |
||||||
|
1.3.2. Project |
0/100 |
$.5 |
$.5 |
$.3 |
Adapted from DAU (2013)
Defense Manufacturing Guide for Program
Managers.